Tuesday, March 15, 2011

Work in Progress Week #9

Another week and another finish, sort of.
New Projects:

None. Zilch. Nothing. Now that is a change. Still considering joining one of the Quilt Alongs though.

Ongoing Projects:

Posh Quilt Top
This top is finally done. However, next week it will in moves into the waiting to be quilted list. So I guess it doesn't get taken off the work in progress list quite yet. I need some batting so I can start the quilting. Any good ideas on design? Maybe you need a better look. Luckily I shared more pictures last night about the Posh Quilt top.

Doll Quilt for SMQG Challenge


A scrappy star for scrap-bee blocks  

Two Star and Pinwheel Inspired Blocks for A Twist on Tradition bee  I have a couple good ideas in my head.

Completed tops awaiting quilting:
Loves Road

I didn't do anything with these:

Halloween Quilt (almost a UFO)

Peace Purse (Really need to just get this one done)

Hexagon Christmas Table Runner/Hexagon Christmas Pillows


UFOs -

Scrappy Bear


This week's stats:

New projects: 0
Completed projects : 0 (but I did get a top done so that is a celebration in itself)
Currently in progress - 10

Wait a second that is a bigger number. I must have miscounted last week. Strange!

Well hopefully I can get some more off my list as I am signed up for the Friday Night Sew In, which will be sewing hexagons in a hotel. Since I had forgot that I had a conference to go to when I signed up, but that won't stop me. Plus Sunday is the sew day for the Sacramento Modern Quilt Guild. We will be sewing at a quilt shop in Folsom, Sew Fun, who are nice enough to let us use their space.

Linking up to:

WIP Wednesday at Freshly Pieced